Remodeling field guide

Kitchen Remodel Budget Breakdown: A Line-Item Method

Build a 2026 kitchen budget from eleven line items, with realistic bands for a cosmetic refresh, a mid-range replacement, and a layout-changing gut remodel.

Kitchen floor plan with cabinet runs and an island beside a budget share chart
Notice the labeled cabinet boxes and the temporary counter: sequence, not speed, is what keeps this room on budget.
FIELD NOTE

A kitchen budget is a scope decision plus eleven priced rows. Cabinets and counters consume about a third of a mid-range job, trades decide whether the job is a replacement or a rebuild, and the reserve is the only row that protects the other ten.

Numbers to plan with

$250–$425Mid-range cost per sq ft2026 US planning range; high-cost metros run 25–60% higher.
25%Cabinet share of a mid-range budgetAbout $16,000 on the 180 sq ft, $64,000 example.
34%Cabinets plus countertopsMillwork and stone together, before appliances or trades.
8–12 weeksSemi-custom cabinet lead timeOrder before demolition; stock is 2–3 weeks, custom 14–20.
5–15 business daysTemplate to counter installationQuartz is faster than natural stone; the sink must be on site.
$7,680Contingency in the example12% of $64,000; 10–15% is the normal mid-range band.
01

Pick the Tier First, Because the Three Bands Share Almost No Line Items

Kitchen budgets fail at the tier decision, long before anyone prices a cabinet door. For 2026, US planning ranges split into three bands: a cosmetic refresh at $12,000–$30,000, or $70–$165 per sq ft; a replace-in-place mid-range remodel at $45,000–$90,000, or $250–$425 per sq ft; and a layout-changing gut remodel at $110,000–$230,000, or $550–$950 per sq ft. High-cost metros such as San Francisco, New York, Seattle, and Boston run 25–60% above those figures, while much of the Midwest and South runs 10–25% below. Replace any national average with two local bids as soon as you have them.

The cosmetic band buys paint, refaced or painted cabinet fronts, new counters, a backsplash, sink and faucet, light fixtures, and often luxury vinyl plank, with the cabinet boxes, plumbing, and electrical layout untouched. The mid-range band buys new semi-custom cabinets, quartz or granite, a full appliance package, new flooring, and a few added circuits, with the sink and range staying put. The gut band buys wall removal, relocated plumbing and gas, a panel upgrade, new subfloor and insulation, exterior venting, and finish carpentry—work that does not exist in the other two bands. Two rules sort most projects: move the sink or range more than 3 ft (0.9 m) from its supply and you are pricing at gut tier; keep the boxes and change only fronts and finishes and you are mid-range even with custom doors.

02

The Eleven-Row Skeleton, With Shares That Add to 100 Percent

Build the skeleton before you call a contractor, then ask every bidder to fill the same rows. Shares matter more than totals, because they reveal whether a proposal is structurally plausible before you compare price. The table allocates a $64,000 mid-range budget for a 180 sq ft (16.7 sq m) kitchen at $356 per sq ft; the shares sum to 100%, reserve included.

Read three numbers before the total. Cabinets at 25% and counters at 9% mean 34% of the money is millwork and stone, which is normal for mid-range work. If a proposal shows cabinets at 12% and a generic labor line at 40%, cabinet installation and carpentry are buried where you cannot audit them. If supervision is missing entirely, ask whether the contractor is charging 15–25% on top of every trade line instead—a legitimate model, but it must appear once, not twice.

  • Add these rows only at gut tier: structural engineer $400–$1,200; temporary kitchen setup $250–$600; street or driveway dumpster permit $50–$500; lead and asbestos testing $400–$900.

Planning skeleton for a 180 sq ft mid-range kitchen, $64,000 total. Shares are targets, not bid requirements; regional labor moves the trade and cabinet lines.

Line itemWhat the number must includeShareExampleCommon failure
Design, drawings, permitsField measure, cabinet and electrical layout, permit fees, plan review4%$2,560Permit pulled after demolition; 1–2 week inspection delay
Protection, demolition, disposalFloor protection, dust walls, tear-out, dumpster, haul-away5%$3,200Dumpster permit or second haul excluded; $300–$800 surprise
Rough-in plumbing, electrical, HVACRelocated drain and supply, dedicated circuits, venting, inspection10%$6,400Panel capacity assumed, not verified; upgrade adds $2,000–$4,500
Framing, drywall, patching, primerOpening headers, soffit changes, patch at tile edges, primer5%$3,200Patch scope limited to kitchen walls; adjacent rooms excluded
Cabinets and hardwareBoxes, fronts, fillers, end panels, crown, pulls, delivery, tax25%$16,000Fillers, panels, and tax quoted separately at order
Countertops, edge, backsplashTemplate, fabrication, sink cutout, edge profile, tile and install9%$5,760Sink chosen after template; re-cut costs $400–$900
Appliances and ventilationRange, refrigerator, dishwasher, hood or insert, microwave, haul-away12%$7,680Ducting and make-up air excluded from the hood line
FlooringMaterial, underlayment, transitions, toe-kick cuts, disposal4%$2,560Subfloor repair found after cabinets are ordered
Sink, faucet, lighting, fixturesSink, faucet, disposal, recessed and task lighting, dimmers4%$2,560Lighting layout changed after drywall; patch and repaint
GC supervision, delivery, cleaningScheduling, site visits, receiving, final clean, punch labor10%$6,400Supervision folded into trade prices, then billed again as overhead
ContingencyOwner-controlled reserve for concealed conditions and written changes12%$7,680Spent on upgrades in week one; nothing left for the drain
03

Cabinets and Countertops Take Half the Money and Most of the Calendar

Mid-range cabinets run $600–$900 per linear foot installed, including fillers, end panels, hardware, delivery, and tax; a 10 × 10 ft (3 × 3 m) kitchen carries roughly 20–22 linear feet of cabinetry, so $13,000–$19,000 is the honest range before any custom insert. Stock cabinets land at $300–$500 per linear foot and arrive in 2–3 weeks, semi-custom in 8–12 weeks, full custom in 14–20 weeks. The deposit date, not the demolition date, sets the schedule—which is why cabinets get ordered before the first hammer swing.

Counters are priced on actual surface, and a 180 sq ft kitchen usually carries 40–50 sq ft once the island and perimeter are measured. Quartz runs $75–$150 per sq ft installed, granite $65–$125, porcelain slab $100–$180, and laminate $30–$60. Fabrication and installation are 40–50% of that figure, so a $48-per-sq-ft slab quote becomes about $110 installed. The template happens only after base cabinets are set and level, quartz fabricates in 5–10 business days, and the sink must be on site because the cutout is machined to the actual bowl. A farmhouse sink bought after template costs $400–$900 to re-cut or modify, plus another week.

04

Rough-In Trades: Replacement Is Cheap, Relocation Is a Different Budget

Electrical is where a simple kitchen quietly becomes a gut job. A fixture swap costs $150–$400, but a new dedicated circuit costs $350–$900, and current code expects dedicated circuits for the dishwasher, disposal, microwave, refrigerator, and at least two GFCI-protected countertop circuits. A full panel means a $2,000–$4,500 upgrade plus a permit and a utility disconnect. If a 100-amp service is feeding an electric range and dryer, assume the upgrade before you price appliances, not after.

Plumbing follows distance and access. A same-cutout sink replacement costs $250–$600; moving it 3–6 ft (0.9–1.8 m) on the same wall runs $1,200–$3,500; crossing a slab runs $3,500–$9,000 because the concrete is cut, the drain re-sloped at 1/4 in per ft, and the patch inspected. Relocating a gas range adds $600–$1,800 plus a permit. An exterior-vented hood runs $700–$2,500 depending on whether the duct exits a wall or roof, and a tight house may need $800–$2,000 of make-up air. Rough-in inspection comes before insulation, and a failure costs $75–$250 plus 2–5 days—so keep the sink within 3 ft of the drain, stack the dishwasher beside the sink cabinet, and leave the range on its existing gas and vent path. Those three rules routinely save $4,000–$9,000.

05

Allowances Set the Final Price, So Write Them Like Specifications

An allowance is a placeholder with a number attached, and it moves the final price more often than the contract total does. A $4,500 countertop allowance over 45 sq ft works out to $100 per sq ft, which does not cover quartz installed at $110–$150. Choose a $128-per-sq-ft stone and the real cost is $5,760: an $810 overage before tax, billed at cost plus 15–25% or at retail depending on the contract language. On this kitchen, one stone decision can move the price by $1,500 or more.

Appliance allowances fail the same way. A $6,000 package buys a mid-grade range, a counter-depth refrigerator, and a mid-tier dishwasher, but a 36-inch (91 cm) pro-style range alone can run $4,500, and a panel-ready refrigerator can run $6,000–$9,000. A $1,200 lighting allowance covers about six recessed fixtures and two pendants at builder pricing; a linear pendant over an island can eat half of it. Every allowance needs four fields: quantity and unit, brand or tier, the overage rate in writing, and a selection deadline set 10 business days before the order date. The named failure is the late stone decision—cabinets ordered, template unschedulable, 2–3 weeks lost while temporary counters cost $250–$500 and meals out run $500–$900 a month.

06

Concealed Damage and Owner Changes Are the Two Biggest Leaks

Concealed damage is the first leak, and it is not optional spending. Rotted subfloor around a sink runs $900–$2,800, a cracked cast-iron drain under a slab $2,000–$5,500, knob-and-tube wiring $1,800–$4,500 for two circuits, and a missing header over an opening $3,500–$9,000. The tripwire is a pre-demolition inspection: $400–$900 for a plumber's camera, an electrician's panel review, and a carpenter opening one wall. It will not find everything, but it converts guesses into line items you can price and compare.

Owner changes are the second leak, and they are self-inflicted. A typical mid-range kitchen absorbs 3–6 changes at $500–$2,000 each, or $1,500–$12,000. Freeze finishes for 30 days once cabinets are ordered; changes after rough-in also carry rework, because moving a switched outlet after drywall costs $250–$600 and moving a drain after inspection costs $1,500–$4,000. Long-lead substitution compounds both: a discontinued door style or a 10-week appliance backorder can hold the counter template hostage. Confirm availability at order, record model numbers, and set a drop-dead date 10 days out—if the item is not confirmed, switch to the second choice before demolition.

07

Sequence, Carrying Costs, and a Ten-Minute Bid Audit

Sequence sets both the calendar and the carrying costs. Design and permits take 3–8 weeks together; cabinet lead time runs 8–16 weeks from deposit; demolition 2–4 days; rough-in 5–8 working days; inspection 1–3 days; insulation and drywall 4–6 days; prime and paint 2–3 days; cabinet install 2–3 days; template plus fabrication 5–15 business days; counters 1 day; backsplash 2–3 days; trim, final electrical, and punch 4–7 days. A mid-range kitchen is typically 9–14 weeks from demolition to usable; a gut remodel runs 14–22 weeks.

Carrying costs belong in the budget rather than a separate mental account. A temporary kitchen—microwave, mini fridge, dish bin—costs $250–$600; meals out run $500–$900 a month; a storage container runs $120–$300 a month. Eight weeks of eating out is $1,000–$1,800 against a $64,000 job, which is real money at tile-selection time. Then audit the bid in ten minutes: count the lines (25–40 is normal), confirm permits, dumpster, final clean, tax, and supervision appear once each, read the exclusions page, and ask who owns the permit, who pays for concealed damage, and what happens when a selection misses its deadline.

  • Plausible bid check: cabinet line 20–30% of total, trade rough-in 8–14%, contingency visible at 10–15%, and a written allowance schedule with quantities and overage rates.
?

Questions that come up on this job

Is $30,000 enough for a kitchen remodel in 2026?

It buys a cosmetic refresh, not a rebuild. $30,000 covers paint, refaced fronts, entry-level quartz or laminate counters, a backsplash, sink and faucet, lighting, and flooring in a 150–200 sq ft kitchen, assuming the cabinet boxes, plumbing, and electrical layout stay. The same money does not cover new semi-custom cabinets plus appliances plus trades; that combination starts near $45,000 in most markets and runs to $90,000 in high-cost metros.

What percentage of a kitchen budget should cabinets be?

Plan 20–30% of the total for cabinets and hardware, installed. In the $64,000 example the cabinet line is 25%, or $16,000 for about 20 linear feet of semi-custom cabinetry. Above 35% usually means custom millwork, and something else—appliances, lighting, or the reserve—is underfunded. Below 15% usually means stock boxes, refacing, or a cabinet allowance that will be exceeded at order.

Do I need a permit to replace kitchen cabinets?

Like-for-like cabinet replacement with no electrical, plumbing, or structural changes often needs no permit, but that is a local call. Moving a wall, adding circuits, relocating a drain or gas line, or installing a new exterior vent almost always requires one. Permit fees commonly run $250–$900 for a kitchen, and plan review can add 1–3 weeks. Call the local building department before signing, and confirm who pulls the permit in the contract.

Should I hire a general contractor or manage the trades myself?

A general contractor typically charges 15–25% on top of construction cost, which is $9,600–$16,000 on the $64,000 example. Managing it yourself can save that fee but costs 10–20 hours a week for 10–14 weeks, and you become the scheduler for cabinet delivery, template, inspection, and five trades. You also own the gaps between warranties. Some lenders and some permit offices require a licensed contractor, so check before deciding.

How much does it cost to move a kitchen sink?

On the same wall and within 3–6 ft (0.9–1.8 m) of the existing drain, plan $1,200–$3,500 including patch and permit. Moving across a slab floor runs $3,500–$9,000 because the concrete is cut, the drain re-sloped at 1/4 in per ft, and the patch inspected. Add $300–$900 if the move also requires a new vent or a relocated dishwasher drain, and add 1–2 weeks to the schedule for rough-in inspection.

Sources & further reading

References behind this guide

These sources support the safety, measurement, or industry conventions used above. Product instructions, approved plans, and local requirements control your project.

Who wrote this

Cost My Reno editorial team

We build the calculators first, then write the guide that explains the same arithmetic in words. Every figure on this page traces to a measurement method, a published standard, or a price range we label as regional. We do not accept payment for product placement, and we publish corrections rather than quietly editing numbers.

How we estimate · Editorial policy · Report a correction